Yamaha YXZ Forums banner
1 - 1 of 1 Posts

·
Registered
Joined
·
392 Posts
MIG the cage and save days. I can do them in usually 6hrs or less. TIG requires a lot more. cleaning more. fit up needs to be perfect. root pass. second pass. you essentially need to weld it twice.
if youre in southern california call us up we can do them fast ready for pick up or drop off your car and we can go crazy with it. roof racks, lights, etc, custom powdercoat etc. ive rolled my car twice, stripped the powder both times to inspect the welds and tubing and re powdercoat it. LSK cage has held up to some ridiculous abuse.
 
1 - 1 of 1 Posts
Top